/ / / / Another stretch of U.S. 158 in lower Currituck getting new pavement this spring
Beach 104

Another stretch of U.S. 158 in lower Currituck getting new pavement this spring

Grinding of the old road surface began on March 24, 2021 at the U.S. 158/N.C. 136 intersection. [Sam…

Grinding of the old road surface began on March 24, 2021 at the U.S. 158/N.C. 136 intersection. [Sam Walker photo] Another stretch of U.S. 158 [Read More]

The post Another stretch of U.S. 158 in lower Currituck getting new pavement this spring appeared first on Beach 104.

FavoriteLoadingAdd to favorites

Credit: Original content published here.